Car Seat Cushion Low Pressure Foaming Machine Multi Function

Business Type
Manufacturer
Country
China

Product Detail

Car Seat Cushion Low Pressure Foaming Machine Multi Function Preface HC-202 series Low Pressure Foaming Machine was designed for rigid and softPU furniture production line. It consists of frame work, materialday tanks, water chiller /heater, gear pumps, inverters, high speed stirrer, PLC computer control system and other latest upgraded elements. Its HMI provides powerful function menu when planted with temperature control, pressure, speed parameter settings, pouring recipes, faults alarm and so on. To cater different production requirements for numerous customers, we have developed multi-composition and function equipment for the market, which have played a big role in stimulating the development speed on polyurethane industry around the world. Application scope of polyurethane (PU) injection machine: PU wood imitation furniture; decorative construction materials, shoes and soles, seat cushions, moto seats, Car seats, Ice box, chilling tanks,PU toys and dolls, art works, carton figures and so on. Main Technical Parameters: - - - - No. | Item | Technical Parameter | 1 | Foam Application | Flexible, rigid, semi-rigidFoam blocks | 2 | Raw Material Viscosity (25) | POLY~2500MPas ISO~2500MPas | 3 | Injection Pressure | 10-20Mpa (adjustable) | 4 | Output (mixing ratio 1:1) | 50~800g/s | 5 | Mixing Ratio Range | 1:2~5:1(adjustable) | 6 | Injection Time | 0.5~99.99S (correct to 0.01S) | 7 | Material Temp Control | 2 | 8 | Repeat Injection Accuracy | 1% | 9 | Hydraulic SystemOutput: | 10L/min | 10 | Tank Volume | 300L | 11 | Compressed Air Needed | 600NL/min | 12 | Temperature Control System | Heat: 29Kw | 13 | Input Power | three-phase five 6square milimeter-wire 380V | 14 | Reciepe | 100 recipes | - - - - # Air compressor (max air press 8kg/cm2), long enough air pipe(6.5*10mm)with connectors. # Electricity source: 380V/50Hz. Three Phase five lines. # Raw material: A(POLY), B(ISO) and MC clean agent. # Moulds and release agent. Electricalcontrolsystem 1.Fullycontrolledby PLC system 2.Large PCL touch screen computer. Figures of temperature, pressure, rotation speed are alldisplayingin the color screen. 3.Alarmfunctionwithacousticwarning. EquipmentIntroduction 1. Two day 300L tanks forRaw Material A(Pol) andB(ISO). Tanks can be added according to your componenets. If your products needs colorant, thenthree day tanks can be realized. 2. Employing PLC central control system, Automatic calibrate metering pump,real time datasaving and inquiry, bilingual language programdisplaying corresponding values fortemperature, pressure, rotation speed, and proportion. 3. Mixture head's main shaft can reach 8600 r/min,savingraw material and production costs, reducingwash times, improvingproduction effiency and ensuringproducts quality. 4.Tank adopts double layers fortemperature insulation, which ensures raw materials in your expectedtemperature,savingenergy and electric; 5. Material hoses and pipelinesare employingThermal conductive insulationlayers for ideal temmperature for materials circulation, realizing the raw materials have constant temperature duringconveying process. Low Pressure FoamingMachine /Pu Foaming Machine: Applicable products: FAQ: 1.Howlongwillyourengineerreachourfactory? Withinoneweekafter the machinearrived atyourfactory. 2.Howmanydayswillyoufinishinstalling? For low pressure and high pressure injection machines, 10days will be enough for our technicians to complete the equipment installation, erection, start-up commissioning and personnel training. For PU molding machine, mold carriers, and sandwich panel production lines, 25 to 30 days are necessary for our technician to complete the assembly,installation, erection, start-up commissioning and personnel training. 3.Whatwould be charged foryourengineers to install and train our people at oversea plant? Usually are thecosts invoving in the asigned ngineer'svisa,airtickets,acommodations, andtheirsalary.It is our policy to charge accordingly. 4.Howlongisyourmachine'swarrantyperiod? Allourmachines are withoneyearguarantee,startingfrom the date of completing the commissioning. 5.Howcouldwedoafteroneyearwarrantyperiod? First, it is our honor toserviceyou, however, travel fees and accomondation fees involing in the service forourtechniciansshall be covered by your side. 6.What shouldwedoifthepartsbrokenwithinwarranty? Wewouldexpressthefreereplacementpartsduringthewarrantydate. 7.DoesyourengineerunderstandEnglish? OurengineersunderstandalittleEnglish.Allofourengineers havemorethanfiveyearsmechanical installationexperience.Inaddition,theycanusebodylanguagetocommunicatewith your people.
Ms. Lydia Shing
Contact Us Contact Details

Similar Products

Construction Machinery

About our Company

Business Type
Manufacturer
Products
Construction Machinery

Regional Suppliers

Construction Machinery in China

Contact Us

HuizhouHeChen Mechanical Equipment Co.,Ltd.

Ms. Lydia Shing

China

Send us a message