Natural Color Main Frame Box Of OA Components From Metal Stamping Tooling

Business Type
Manufacturer
Country
China
Category

Product Detail

OA Components - - - - Item | Description | Mould Material | SKD11, D2, SKH51, SKD61, Cr12MoV ,etc | Work piece Material | Alloy steel: SKD11, SKD61, Cr12MoV, SLD, DC53 High speed steel: | SKH51, SKH9, YXM1 | Mould Tolerance | 0.001-0.003 mm | Productions Cover | Sheet metal auto parts, Auto stamping parts, Home Electrics stamping | parts, Device stamping parts, etc | Productivity | Max 800 pcs/min, normally 40-60pcs/min | Work piece Precision | 0.005mm | Market | Inner | Life Time | Max 1 million times, normally 0.3-0.5million times | Surface Treatment | Powder coating, Painting, Polishing | Service | OEM / ODM service | - - - - production flow: - - - - Drawing release | Customer issued PDF, 2D or 3D drawing to us, if no drawing, customer can send samples to us for reference. | Quotation reply | After receiving customer new RFQ, we'll quote to customer within 3days, including CIF, FOB or others | Material & Manufacture Confirmation | After quotation approval, we'll provide detail information to customer, the material types, such as DC53, K110, S390, S690, S790 etc. | Life time | The tooling life time, and tooling component life time, and the parameter data, we can meet 100% surface finish, 0.001-0.003 size tolerance, for rotor stator, the rotation for lamination within 180 degree, and the stamping speed can reach 350-400 strokes per min. | Lead time feedback | Usually the tooling components lead time is 1-3weeks, and mold manufacture is about 1-6 months, we will feedback the lead time according customer precision request. this is just manufacture time, not including the shipment time. | Payment discussion | We can accept the TT, LC, Payment advance, or others | Samples submit | If the die manufacture, we'll submit 2-5pcs to customer for checking, other extra quantity, will be take charge of it. | Sample approval | Customer checking the samples, please approval to us by written form. | Shipment arrangement | Normally the shipment will according customer request, by DHL, FEDEX , UPS or by sea, by air. | The goods confirm | The goods confirmed by our customer passed ISO9001, we'll do full inspect before shipment | The balance payment finish | After customer confirm the goods, the balance payment should finish within 2weeks. | - - - -
Ms. Choven Chan
Contact Us Contact Details

Similar Products

Optical Supplies

About our Company

Business Type
Manufacturer
Products
Optical Supplies

Regional Suppliers

Optical Supplies in China

Contact Us

DONGGUAN CITY XANDER AUTOMOTIVE STAMPING&TOOLING CO,.LTD

Ms. Choven Chan

China

Send us a message